OVUM

Cologne

Distinctive
architecture

In the trendy western Cologne district of Braunsfeld, a new, representative quarter is emerging for the district. The office and hotel campus, which is completed with gastronomy and retail space, is particularly characterized by the high-quality architectural concept. The oval square between the individual buildings offers an enormous quality of stay. The DGNB Gold and Wired Score Gold certifications complete the picture of the future-oriented and sustainable neighborhood.

Close up

It's in the mix

The project involves the construction of a new four-part building complex with a two-level underground parking garage. The property is located in the western Cologne district of Braunsfeld, between high-quality residential areas in the south and commercial structures in the north.

Public space with a high quality of stay

A district combining office, hotel, restaurant and retail uses is being built on the approx. 12,000 m² site. The individual buildings are arranged around a striking oval public square, which, thanks to the mix of uses, will ensure that the area is lively even outside office hours.

In a good neighborhood

The building complex creates a street space with the continuous facade along Stolberger Strasse and Eupener Strasse, as well as attractive spatial sequences. The five- to six-storey clinker brick buildings rise up from a 5.75-metre-high entrance base floor consisting of high-quality exposed concrete arches. The design creates attractive sequences of spaces: from the guided tour through enclosed paths between the buildings to an open oval square.

Factsheet

Fact Sheet

Hauptmieter

  • Bundesanstalt für Immobilienaufgaben
  • Meininger Hotels
  • WBS Legal
  • GLOBAL Service
  • REWE
  • SK Gaming

Status

Fertiggestellt,
under Management

Address

Stolberger Str. 343, 345, 347 and Euperner Str. 67, 67a, 50933 Cologne

Plot size

12.131 m2

Gross floor area (o)

31.460 m2

Type of use

Office, hotel, local amenities

Rental units

41

Start of construction

2020

Completion

2023

CREM Pfad
Stranding Point

2046

Fernwärme, Ökostrom
Backstein, Stahl, Beton, Glas
  • 269 Pkw-Stellplätze
  • 45 E-Ladestationen für Autos
  • 235 Fahrradabstellplätze
  • 11 Minuten Fußweg zum nächsten Bahnhof

Joint Venture Partner

Letting

Projekt Insights

Impressions from the topping-out ceremony

The gallery offers a glimpse of the OVUM topping-out ceremony. Experience the atmosphere, guests and festive mood in our pictures.