OVUM

Cologne

Distinctive
architecture

A new, prestigious quarter for the district is being created in the trendy western Cologne neighborhood of Braunsfeld. The office and hotel campus, which will be complemented by restaurants and retail space, is particularly notable for its high-quality architectural concept. The oval plaza between the individual buildings offers an exceptional quality of life. The DGNB Gold and Wired Score Gold certifications complete the picture of this future-oriented and sustainable neighborhood.

Close up

It's all in the mix

The project involves the construction of a new four-part building complex with a two-story underground car park. The site is located in the western Cologne district of Braunsfeld, between high-quality residential areas in the south and commercial structures in the north.

Public space with a high quality of life

A neighborhood is being built on the approximately 12,000 m² site, which combines office, hotel, restaurant, and retail uses. The individual buildings are arranged around a striking oval-shaped public square, which will enliven the surrounding area even outside office hours thanks to the mix of uses.

In a good neighborhood

The building ensemble creates a street space with a continuous façade along Stolberger Straße and Eupener Straße, as well as attractive spatial sequences. The five- to six-story clinker-brick buildings rise above a 5.75-meter-high entrance base consisting of high-quality exposed concrete arches. The design creates attractive spatial sequences: from the guided path between the buildings to an opening oval plaza.

Photo credits: Stefan Müller

Factsheet

Playlist

15 Videos

Tenants (excerpt)

Joint Venture / Vermarktung

Fact Sheet

Hauptmieter

  • Bundesanstalt für Immobilienaufgaben
  • Meininger Hotels
  • WBS Legal
  • GLOBAL Service
  • REWE
  • SK Gaming

Status

Fertiggestellt,
under Management

Address

Stolberger Str. 343, 345, 347 and Eupener Str. 67, 67a, 50933 Cologne

Site size

12.131 m2

GFA (o)

31.460 m2

Type of use

Office, hotel, local amenities

Rental units

41

Construction start

2020

Completion

2023

CREM Pfad
Stranding Point

2046

Fernwärme, Ökostrom
Backstein, Stahl, Beton, Glas
  • 269 Pkw-Stellplätze
  • 45 E-Ladestationen für Autos
  • 235 Fahrradabstellplätze
  • 11 Minuten Fußweg zum nächsten Bahnhof

Joint Venture Partner

Letting

Fully let

Letting

Project Insights

Impressions from the topping-out ceremony

The gallery offers a glimpse into the OVUM topping-out ceremony. Experience the atmosphere, guests, and festive mood in our photos.